Every project is vetted, monitored, and reported on. Browse our current work — and choose where your donation goes.
Browse by Category
All Projects
Community Infrastructure
Mosque Construction Project
Construction of a mosque with a building area of 166.2 m², including flooring, electrical wiring, a drinking water well, and two toilets. Total cost: $25,000.
Jowzjan, Balkh, Sar-e Pol & Faryab
Community Infrastructure
Mosque Construction Project
Construction of a mosque with a building area of 307.2 m², including flooring, electrical wiring, a drinking water well, and two toilets. Total cost: $46,000.
Jowzjan, Balkh, Sar-e Pol & Faryab
Clean Water
Drinking Water Well Drilling
Well drilling project at a depth of 70–80 meters, including a water storage system, well drilling, and a solar system. Total cost: $1,700.
Jowzjan
Community Infrastructure
Shelter Construction Project
Shelter construction for needy and displaced families, including kitchen equipment and room carpeting. Cost: $3,500 per shelter.
Jowzjan, Faryab, Sar-e Pol & Balkh
Qurbani Program
Cow Sacrifice Program
Cow sacrifice program (Qurbani): medium cow $750, large cow $850. Providing fresh meat to families in need during sacrifice season.
Jowzjan
Qurbani Program
Qurbani Program 1405 (2026)
Cow sacrifice program (Qurbani): 60 sheep and 177 cows. Providing fresh meat to families in need during sacrifice season. Total cost: $131,900.
Jawzjan, Sar-e Pol, Faryab & Balkh
Every Project Needs
Your Support.
Choose a project and make a direct impact — 100% of your donation goes to the field.